Login / Join

Fundamental analysis by بورس نیلوفری about Stock تاصیکو on 9/8/2025

https://sahmeto.com/message/3761017
بورس نیلوفری
بورس نیلوفری
Rank: 304
2.5

#Assembly #Tasiko Sadr Sadr Investment Company Assembly Report: The project of construction of the Ilam stone paper factory has a capacity of 4,000 tons per year. ✅ In the fiscal year of the report, 5 kg of gold and about 5 kg of silver were sold on the commodity exchange. The executive operations of the three gold production projects continue to a total of 5 kg a year. The completion of the drilling operation in the Qalqal Mine is 2 meters and the increase in the content of the definitive storage of pure gold from 3 tons to 3 tons in the Kurdistan Gold Mines Development Company, including measures taken in the gold field. The Carrier of the Hamzah Qinian mineral area has been received with a definitive reserve of 5 million tons. The completion and exploitation of the 2 -megawatt Masino Tabas power plant has been signed in cooperation with Ghadir Electricity and Energy, Ghadir Mines, Imidro and the Ministry of Energy. The project is on the agenda of the design, equipping and preparation of the Sophistic Iodine Mineral area in Golestan. Mining Operations and Iodine Project Studies have been derived from deep sessions at the Iranian Minerals Company. ava .gah.com @Agahmoshaver

Translated from: Farsi
Show Original Message
Signal Type: Neutral
Price at Publish Time:
10,240
Share
Signals
Top Traders
Feed
Alerts