Login / Join

Fundamental analysis by بورس نیلوفری about Stock حفاری on 8/27/2025

https://sahmeto.com/message/3738232
بورس نیلوفری
بورس نیلوفری
Rank: 475
2.2
،Fundamental،بورس نیلوفری

✴️ Maximum use of Iranian engineers and specialists "Our focus in the past years was still on the development of joint fields, especially in the West of Karun," said a report on the future plans of the Petroleum Engineering and Development Company. In this regard, new projects have been designed to complete the capacity of Azadegan, Remembrance, Azar and other joint fields. The installation of a pre -made salt unit is also planned in the springs' operation unit, which, with the launch of this pre -debris desalination unit, will be eliminated for a period of production of high آب wells. Pointing out that in order to achieve production goals, we must also introduce new harvesting and drilling technologies as we develop the infrastructure, adding: "By examining the successful experiences of other countries working in similar conditions, we have come up with patterns that can reduce both development costs and speed up work, as well as reduce equipment." Saddon on Sadid Industrial Website Www.sadid.ir

Translated from: Farsi
Show Original Message
Signal Type: Neutral
Price at Publish Time:
3,663
Share
Signals
Top Traders
Feed
Alerts