Login / Join

Fundamental analysis by بورس24 | Bourse24 about Stock ومعادن on 7/20/2025

https://sahmeto.com/message/3646580

The #and the Mines We have projects in Golgohar, Chadelmu, and Ghahrzam that we need to provide the necessary resources to enable them to enable them. In addition to these projects, we have fourteen direct projects ourselves. These projects are except manifestation, and with the current conditions, if they are planned to be implemented, the necessary investment must be made to implement them. I am pleased to pay attention to this issue. 📌 Currently, the company's profits, for example, is $ 1.5 trillion; If we five times this amount, it will reach about $ 5 trillion. If you divide $ 5 trillion by $ 5 trillion, it will be about three times the international average. Therefore, there must be enough resources so that the designer can move the project and be implemented. Given the current capital capital and the need for $ 1.5 billion or euros of capital to implement projects, I would like to pay sufficient attention to resources. A sample of these projects is the Kurdistan Steel Iron Ore Project, which has a sponge iron production project and is currently more than 5 % progress and fortunately is in good condition. The Megamdol project is in the Bijar area with a capacity of 1.5 million tons. The next project is the Kurdistan Steel Project, which requires about 2 million euros plus $ 5 trillion in capital and is underway in the Qorveh area. Another project is the Sanoor Concentrate, whose construction has begun and its design has been completed. The mineral range of the project has been removed from the project to eliminate the 1.5 km transportation and bring more profit in the future. The Saba Pellet Project West Hope has also improved by 5 %. All foreign equipment has been imported and only the remaining four are loading and shipping to the country. The installation contract has also been signed by yesterday and after installation, we will try to complete the project by the end of the year. The Dynamic Energy Project is also managed by Mr. Sepehr, one of our successful companies that has had good profitability from the sale of electricity. Previously, we had 2 MW of electricity and with the use of the new 2 MW in Semnan, the capacity has reached 2 MW. We are now building a 2 -megawatt steam unit due to the use of Class E turbines in power plants. In addition, the solar power plant is in Semnan (1 to 2 MW) and a 2 -megawatt power plant in Kermanshah. The steam power plant has also begun and its engineering has been completed, with a 4.7 % progress. The important point is that the construction of steam turbines with internal knowledge is being implemented for the first time in the country, and we hope that this success will promote the advancement of technology and a bright future in the field of power. @Bourse24ir

Translated from: Farsi
Show Original Message
Signal Type: Neutral
Price at Publish Time:
2,115
Share
Signals
Top Traders
Feed
Alerts