Fundamental analysis by بورس24 | Bourse24 about Stock فملی on 10/1/2024
Mohammad Mehdi Saberi, Head of Dara Zar Mining Engineering Unit during the Capital Market participants visit Darazar Mining in the Sarchehs of National Copper Company #Femli The factory's hot top has started approximately 6 months ago. The valley mine is 2 million tons and a tailing of 2 million tons, with a total of 2 million tonnes with a 10 -percent grade. 📌 This mineral mine is a source of a nominal capacity of 4,000 tons of concentrate. Extraction and tailing operations in the Valley Mine have been successful. This year, mineral activities have included simultaneous extraction of minerals and tailings. Due to the approximate setup of the processing plant, the production process continued on a continuous basis. The definitive mining of the mine is estimated at 5 million tonnes with an average grade of 5 %. Also, the volume of predictable tailings is estimated at 2 million tonnes during the 4 -year operation period. The annual extraction tonnage varied by 1.5 to 3.5 million tons. After drilling using an explosive pits of 2 inches (in the range of 2 to 5 inches), explosives are carried out with explosives. Then, the materials extracted by mechanical shovels are loaded and transferred to the designated locations by trucks with a capacity of 1 and 2 tons. Minerals become the final product after passing through the stairs, processing, melting and refining. #Visit_familia @Bourse24ir