
ولساپا
لیزینگ رایان سایپا
تریدر | نوع پیام | حد سود/ضرر | زمان انتشار | مشاهده پیام |
---|---|---|---|---|
![]() سیگنال برترRank: 90 | خرید | حد سود: تعیین نشده حد ضرر: تعیین نشده | 10/11/2025 | |
![]() محمدرضا موسویRank: 152 | خرید | حد سود: تعیین نشده حد ضرر: تعیین نشده | 9/27/2025 | |
![]() محسن نظری تحلیل تکنوفاندامنتالRank: 125 | خرید | حد سود: تعیین نشده حد ضرر: تعیین نشده | 9/27/2025 | |
![]() 💯 سهام سودآور 💯Rank: 119 | خرید | حد سود: تعیین نشده حد ضرر: تعیین نشده | 9/20/2025 | |
![]() پویش تفکر مستقلRank: 299 | خرید | حد سود: تعیین نشده حد ضرر: تعیین نشده | 9/8/2025 |
Adjusted Price Chart of ولساپا
سود 3 Months :
پیامهای ولساپا
Filter
Sort messages by
Trader Type
Time Frame

بورس 888
✅ Volsapa We get to know another market junk; Two -year -olds negative 50 % Distance from the ceiling: 85- (22/04/2019)

سیگنال برتر
#Volsapa Time w The share is on a downtrend and in the short term has the channel ceiling resistance if it is modified to support 48 USD. @Chanelvip20
# #Walsapa 💹 @tse_plus 📅 1404/7/13 ⌚ 11:39:08 🔖 619 #Buy 3 real code in the queue Value 8,340,193,064 Rials Per capita purchase of each code 2,780,064,561 Rials
📢 reopening trading symbols 🏷 #Kaveh #Pakman #Nouri #Vakh #Volsapa | #Reopen_Nadam According to Tehran Stock Exchange Operations Management: The following trading symbols after disclosing the important information of Group B are today with the restriction of price volatility opening and ready to make a deal: 1- Kaveh Steel South Kish (Kaveh) 2- Barz Industrial Group (Pakman) 3- Nouri Petrochemical (Nouri) 4- Investment of Behshahr Industrial Group (and Nana) 5- Ryan Saipa Leasing (Walsapa) Note: Transactions of these symbols were subject to volatility limitation at today's reopening. ╭━━ 🚀 @samantahlil members ╰━━ 💠 In the course of analysis, awareness and transformation ... 💠 💠 💠

🏆بورس تکنیک 📉💰
#Support #Resistance ✍️ (smaller number: Support/ larger number: Resistance) Lever 1, 2 Sheptis 1, 2 Refining 1, 2 Ghulam 1, 2 Wave 1, 2 Jewel 1, 2 Tapkish 1, 2 Estegon 1, 2 Steel 1, 2 Walsapa 1, 2 Electrohmad 1, 2 Governor 1, 2 East 1, 2 Carry 1, 2 Shasta 1, 2 Car 1, 2 Khagster 1, 2 Thaid 1, 2 Dogam 1, 2 Family 1, 2 Amber 1, 1 Fazr 1, 2 Surbs 1, 2 Blessings 1, 2 Vallet 2, 2 🟢#Stock Exchange-Technical VIP Technical and Professional October 1

بورس طارم
افشای فوری کدال: شوک 45 درصدی قیمتها و توقف ناگهانی کارخانه! (اخبار 9 مهر)
#Summary_Childer (Disclosure of Information 1 October 1) ⬇️ ⬇️ الف ⬇️ #Pasa The sale price of all products of this company increases by 15 % from 10/07/10. #Ghul Iodine of six dongs and lords of a باب factory to the No. 58 Subsidiary No. 5 of the 130s of the Ardebil Section 3 resulted in the suspension of the production of Ardebil Factory production. ⬇️ Information #Volsapa Failure to obtain the result of Firouzkouh poultry auction for lack of applicant #Shakir The rates increased by 6.49% compared to 1403, with the financial effects of this increase for the second six months of 1404, 800.8 million rials. #And Nana Receive a Certificate of Construction in Pearl Project with 747.345.192.381 Rial #Dahawi The sales rate of 31 fonts of the company's products based on the Food and Drug Administration's license and syndicate has increased by 45% on average #This Sale of Dudd Fam Industrial Company to Iran Tire Company for 1,270,794 million Rials #Pars #Zagros #Shafan #Shogoya Announcing the rates of the peripherals by the National Petrochemical Company #Nouri #Aria According to the company's forecast for side services in the budget of 1404, the increase in the rates of these rates is not subject to the disclosure of the information registered with the Stock Exchange. #Packman Rate 8 % Products Rate from 04/07/10 #Kaveh Construction of a power plant to supply part of the electricity required by the Agreement Industry: 24 million euros - Kaveh South Kish Steel Company 315 MW of annual electricity needs to produce its billet bullion and provides its annual electricity consumption by concluding the above 273 MW agreement - #Wana Take measures to submit experts to obtain a 1053 % capital increase in long -term investment revaluation permit #Church Contracting Service Service, Repair and Replacement of Spare Parts and Maintenance of Types of Devices with Soleiko Cala Company to 3 million Rials 04_07_09 @indexerr

🏆بورس تکنیک 📉💰
خلاصه فوری کدال ۹ مهر: افزایش نرخها، توقف تولید و پروژههای بزرگ در بورس!
#Summary_Childer (Disclosure of Information 1 October 1) ⬇️ ⬇️ الف ⬇️ #Pasa The sale of all products of this company increases by 15 % from 10/07/10. #Ghul Iodine of six dongs and lords of a باب factory to the No. 58 Subsidiary No. 5 of the 130s of the Ardebil Section 3 resulted in the suspension of the production of Ardebil Factory production. ⬇️ Information #Volsapa Failure to obtain the result of Firouzkouh poultry auction for lack of applicant #Shakir The rates increased by 6.49% compared to 1403, with the financial effects of this increase for the second six months of 1404, 800.8 million rials. #And Nana Receive a Certificate of Construction in Pearl Project with 747.345.192.381 Rial #Dahawi The sales rate of 31 fonts of the company's products based on the Food and Drug Administration's license and syndicate has increased by 45% on average #This Sale of Dudd Fam Industrial Company to Iran Tire Company for 1,270,794 million Rials #Pars #Zagros #Shafan #Shogoya Announcing the rates of the peripherals by the National Petrochemical Company #Nouri #Aria According to the company's forecast for side services in the budget of 1404, the increase in the rates of these rates is not subject to the disclosure of the information registered with the Stock Exchange. #Packman Rate 8 % Products Rate from 04/07/10 #Kaveh Construction of a power plant to supply part of the electricity required by the Agreement Industry: 24 million euros - Kaveh South Kish Steel Company 315 MW of annual electricity needs to produce its billet bullion and provides its annual electricity consumption by concluding the above 273 MW agreement - #Wana Take measures to submit experts to obtain a 1053 % capital increase in long -term investment revaluation permit #Church Contracting Service Service, Repair and Replacement of Spare Parts and Maintenance of Types of Devices with Soleiko Cala Company to 3 million Rials 04_07_09

دکتر سید پرویز جلیلی: دانشگاه بورس
خلاصه فوری کدال ۹ مهر: افزایش نرخها، توقف تولید کارخانه، و قراردادهای میلیاردی شرکتها
#Summary_Childer (Disclosure of Information 1 October 1) ⬇️ ⬇️ الف ⬇️ #Pasa The sale of all products of this company increases by 15 % from 10/07/10. #Ghul Iodine of six dongs and lords of a باب factory to the No. 58 Subsidiary No. 5 of the 130s of the Ardebil Section 3 resulted in the suspension of the production of Ardebil Factory production. ⬇️ Information #Volsapa Failure to obtain the result of Firouzkouh poultry auction for lack of applicant #Shakir The rates increased by 6.49% compared to 1403, with the financial effects of this increase for the second six months of 1404, 800.8 million rials. #And Nana Receive a Certificate of Construction in Pearl Project with 747.345.192.381 Rial #Dahawi The sales rate of 31 fonts of the company's products based on the Food and Drug Administration's license and syndicate has increased by 45% on average #This Sale of Dudd Fam Industrial Company to Iran Tire Company for 1,270,794 million Rials #Pars #Zagros #Shafan #Shogoya Announcing the rates of the peripherals by the National Petrochemical Company #Nouri #Aria According to the company's forecast for side services in the budget of 1404, the increase in the rates of these rates is not subject to the disclosure of the information registered with the Stock Exchange. #Packman Rate 8 % Products Rate from 04/07/10 #Kaveh Construction of a power plant to supply part of the electricity required by the Agreement Industry: 24 million euros - Kaveh South Kish Steel Company 315 MW of annual electricity needs to produce its billet bullion and provides its annual electricity consumption by concluding the above 273 MW agreement - #Wana Take measures to submit experts to obtain a 1053 % capital increase in long -term investment revaluation permit #Church Contracting Service Service, Repair and Replacement of Spare Parts and Maintenance of Types of Devices with Soleiko Cala Company to 3 million Rials 04_07_09 Index
عدم موفقیت سایپا در مزایده گروه ب: افشای اطلاعات مهم مالی تا سال 1404
#Volsapa Specifications of the Audit Committee and the Internal Audit Unit (Amendment) The Statute attached in the announcement in the extraordinary general assembly has been approved 1404-07-07 17:37:44 (1412041) ایرین ایرین @codal360_ir
Disclaimer
Any content and materials included in Sahmeto's website and official communication channels are a compilation of personal opinions and analyses and are not binding. They do not constitute any recommendation for buying, selling, entering or exiting the stock market and cryptocurrency market. Also, all news and analyses included in the website and channels are merely republished information from official and unofficial domestic and foreign sources, and it is obvious that users of the said content are responsible for following up and ensuring the authenticity and accuracy of the materials. Therefore, while disclaiming responsibility, it is declared that the responsibility for any decision-making, action, and potential profit and loss in the capital market and cryptocurrency market lies with the trader.