
رمپنا
گروه مپنا (سهامی عام)
تریدر | نوع پیام | حد سود/ضرر | زمان انتشار | مشاهده پیام |
---|---|---|---|---|
![]() سهم چی بخریم؟Rank: 208 | خرید | حد سود: تعیین نشده حد ضرر: تعیین نشده | 10/3/2025 | |
![]() شرکت بیمه مرکزی جمهوری اسلامی ایرانRank: 170 | خرید | حد سود: تعیین نشده حد ضرر: تعیین نشده | 9/22/2025 | |
![]() کانال هرمس سهمRank: 881 | خرید | حد سود: تعیین نشده حد ضرر: تعیین نشده | 9/22/2025 | |
![]() بورس طارمRank: 516 | خرید | حد سود: تعیین نشده حد ضرر: تعیین نشده | 9/8/2025 | |
![]() بزرگان بورس تبریزRank: 1042 | خرید | حد سود: ۱۷٬۵۰۰ حد ضرر: ۸٬۸۰۰ | 9/20/2025 |
Adjusted Price Chart of رمپنا
سود 3 Months :
پیامهای رمپنا
Filter
Sort messages by
Trader Type
Time Frame

نبض بازار بورس
Were nominated in the #rampna assembly The company's currency claims are $ 1.5 billion in foreign exchange debt and $ 1.2 billion in foreign exchange rates.

هم افزایان بورس تهران
#Rampena divided 1 Toman per share Pay 28 November
#Rampena Summary of Decisions #Suman_Phuman_12_12_12/12/12/30 Company ▪️ Session Time: 1404/07/20 at 08:30 ▪️ Registered Capital: 60,000,000,000 Rials ▪️ Profit per share: 4,851 Rials ▪️ Cash profit per share: 620 Rials ▪️ Cumped profit at the end of the course: 466,392,269 million Rials 1404-07-20 17:17:17 (1417095) ایرین ایرین @codal360_ir

BourseMag|مجله بورس
#Assembly #Rampena At the end of the Assembly, a cash profit was divided among shareholders per share.
Were nominated in the #rampna assembly The company's currency claims are $ 1.5 billion in foreign exchange debt and $ 1.2 billion in foreign exchange rates. Conscious @SSPress
#Rampena Assembly Since the beginning of 1, the Energy Housing Housing Pilot Project is underway, which offers an integrated energy management model and آب with about 1-5 energy optimization technology and آب. The project, while having the national impact, has the capacity to convert to direct consumer -oriented business for the base group. The gas turbocharger is designed and manufactured for the first time in the country's energy industry and can be an effective alternative to electricity -backing motors and generators in homes, industries and public places. The first is on the verge of finishing and the other three will be completed by the end of this year. In addition to home application, the equipment was also used in the Syrian Square Gas Storage Project. @Bourse24ir
In the case of the liberalization of blocked foreign exchange resources in Iraq, the complex is using all domestic and foreign capacities, including MAPNA, Central Bank, Currency and Gold Exchange Center and other international routes to pursue the matter to provide access to resources. The second is about the Mobilization section. This sector has no financial return on the volume of assets and investment. At the Board of Directors, it is decided that the possibility of transferring Mobilization activities to specialist companies in this field should be examined to maintain the group's focus on the power chain. Initial negotiations have been held with an active collection in the field, but have not yet reached the final result. About two years ago, targeting some transport companies has been pursued that is still being pursued. Even if the stock market is not transferred or supplied, the general policy is that these units should move towards greater profitability and sustainability. In the year 9, new transportation activities have begun, which in the first half resulted in a number of important contracts with public and private employers worth about 1.5. These contracts have a positive impact, especially in the manufacturers and repair companies of the Mobilite sector, and provide the basis for profitability growth. #Rampena @Bourse24ir

سهم گلچین
Company profitability report: MAPNA Nour Kish Drilling from #Rampena subsidiaries has reached 2451 billion billionaires in the 6 -month report #Vesphar has made a profit in the six months. The share must be seen in a combination of 6 months. https://t.me/sahm_golchin_bourse
#Rampena The MAPNA Group's Ordinary General Assembly was held with the participation of 1.5 % of shareholders. If the gas is supplied sufficiently in the winter, it would have a power outage; Because the main issue in winter is gas. In fact, the issue of energy is related to gas in the winter, while the summer problem goes back to the infrastructure and production capacity. Of course, it is unlikely that there is no problem in the field of gas or liquid fuel this year. 📌 We are pursuing our demands from the government to fulfill the salaries and interests of the shareholders of the MAPNA Collection. This is seriously pursued, and God willing, the relevant agreement has been signed within the next one or two weeks. According to the memorandum, a two -year operational plan for years 1 and 2 is anticipated that after the finalization, official information was provided through the coding system. @Bourse24ir
#Rampna divided 620 Rials
Disclaimer
Any content and materials included in Sahmeto's website and official communication channels are a compilation of personal opinions and analyses and are not binding. They do not constitute any recommendation for buying, selling, entering or exiting the stock market and cryptocurrency market. Also, all news and analyses included in the website and channels are merely republished information from official and unofficial domestic and foreign sources, and it is obvious that users of the said content are responsible for following up and ensuring the authenticity and accuracy of the materials. Therefore, while disclaiming responsibility, it is declared that the responsibility for any decision-making, action, and potential profit and loss in the capital market and cryptocurrency market lies with the trader.