Login / Join

Fundamental analysis by بورس24 | Bourse24 about Stock فملی on 10/2/2024

https://sahmeto.com/message/2874324

The two -phase of the two Miduk Phase Two projects started from 2, which now has a 5 % physical progress and opened by the end of the year, with the production of 6,000 tonnes of concentrate, $ 5 million estimated the annual project revenue for the national copper. Phase 2 of the project is 2 percent progress, with a 5,000 -ton concentrate production and a $ 5 million annual operating income for #Femlie. This project is put into operation. The Khatun Abad project is a melted flotation, which is 2,000 tons of concentrate and has 2 % physical progress, which ends. 📌 Khatunabad Lime Factory about 2 % of the physical progress that will be operational by the end of this year. The Khatun Abad Solar Plant, as the country's largest solar power plant with 2 MW capacity, is also ready to open. @Bourse24ir

Translated from: Farsi
Show Original Message
Signal Type: Neutral
Price at Publish Time:
2,917
Share
Signals
Top Traders
Feed
Alerts